好字典是免费的在线辞海新华字典查询网站,内容来源于网络,如有侵权请及时通知我们删除。
如显示乱码,请安装支持7万5千多字显示的中日韩越超大规模字符集,下载地址:百度网盘;提取码: y1x5
好字典查字网,具有汉语字典、汉语词典、辞海和百科词典的主要功能,可以在线查字典,提供包括汉字解释、汉字起源、汉字源流、汉字演变、书法字典等内容。
好字典查字网是一部大型综合性网络汉语字典,我们将继续丰富和完善好字典,以期更好地帮助用户。
词语坝基拆分为汉字:
坝字的拼音、笔画、偏旁部首、笔顺、繁体字,坝字字源来历,坝字演变
截住河流的构筑物:拦河~。堤~。河工险要处、巩固堤防的构筑物。平地(多用于地名):雁门~(在中国四川省)。方言,沙滩,沙洲。……
基字的拼音、笔画、偏旁部首、笔顺、繁体字,基字字源来历,基字演变
建筑物的根脚:~石。~础。奠~。根本的,起始的:~本。~业。~层。~点。~准。根据:~于。化学上化合物的分子中所含的一部分子原子被看作是一个单位时,称作“基”:~团。~态。氨~。羧~。……
汉语拼音:bà jī
Dam, dam foundation of anti-plugging, excavation around the gushing water and basal sand Chung grouting can be used to deal with.
坝体、坝基的防渗堵漏、基坑周边渗水和基底涌水涌沙都可采用注浆法处理。It was shown that the creep deformation of the dam body and foundation was on a small level and tended to be stable.
通过对该坝的流变计算,得出坝体、坝基流变变形较小,而且基本趋于稳定的结论。The seepage discharge of the foundation of earth-rock dam decreases gradually and is in a parabola form as the blanket extends.
土石坝坝基渗流量随铺盖的延长逐渐减小,并呈抛物线形分布;the surface of the unloading fissures is almost parallel to the surface of excavation base.
裂隙面发育与坝基开挖面近于平行,形成兜底缝。use rigid limit equilibrium method, such as the surface of four methods of foundation stability against sliding for a check.
运用刚性极限平衡法对坝基表层抗滑稳定性进行了验算。The achievements presented in this thesis can be expanded into the other similar dam foundation engineering at high-stress valley region.
本文的研究成果对类似高地应力峡谷坝基工程具有良好的应用推广价值。it is possible to determine the third angle of rupture for stable dam foundations.
第三破裂面倾角根据坝基深层抗滑稳定最不利的情况确定。The deep overburden will also appear horizontal displacement to upper and down streams after dam construction.
受坝体的影响,坝基深厚覆盖层也会向上、下游发生水平位移;The material must have enough plasticity for avoiding cracks while dam and its foundation become deformed.
土料须具有足够的塑性,使之能适应坝体及坝基的变形而不致产生裂缝。坝基渗透变形
dam foundation seepage deformation
坝基截水墙槽
key trench
坝基风化槽
weathered deep troughs in dam foundation.
坝基建基面
dam foundation plane.
坝基岩体分类
Classification of Rock Mass of Dam Foundation
坝基补缝填坑处理
dental treatment
坝基体系的相互作用。
the effect between ground sill and dam.
白石水库坝基的工程地质问题
Engineering geology of dam foundation in Baishi reservoir
西河缓洪库坝基处理方案探讨
Discussion on the Foundation Treatment of Xihe Flood Detention Reservoir
砼防渗墙对深厚覆盖层坝基的处理
The treatment for deep dam foundation of the concrete cut off wall
坝基一定要在洪汛期到来之前加固好。
The embankment must be reinforced before the flood season.
坝基岩石抗剪断参数的统计特征
Statistic Characteristics of Shear Strength Parameters of Dam Foundation Rocks.
重力坝坝基面的非局部摩擦分析
Nonlocal Friction Analysis of Gravity Dam Along Interface Between Dam and Foundation.
梅山连拱坝两岸坝基水质特性及评价
Characteristics and assessment of water quality at dam foundation near the abutment of Meishan multiple arch dam
碾压混凝土坝坝基的几个工程地质问题
Several engineering geological problems about the RCC dam foundation
钻孔弹模仪检测坝基固结灌浆效果
Detection of consolidation grouting effects in bedrock of dam of borehole dilatometer
洪石岩电站拦河坝复合式坝基方案的设计
Design of Composite Dam Foundation Scenarios for the Hongshiyan Power Station Barrage
铜街子水电站坝基深层抗滑稳定性分析
The Sliding Stability of the Deep Layer Foundation of Tong Jie Zi Power Station with Respect to Strength
西霞院坝基粉细砂的动力特性研究
Study on Dynamic Behavior of Fine Silt of Xixiayuan Dam Foundation
水城水库副坝坝基专门工程地质问题勘察研究
Create a Water Safety Network of the Pearl River and Be Spokesperson of Rivers
坝基卸荷回弹张裂面声波异常分析研究
THE ANALYSIS OF ACOUSTIC WAVE ANOMALY FOR STRESS RELEASE REBOUND TENSION FISSURE PLANE OF DAM FOUNDATION
用混合模型反演法计算水电站坝基弹性模量
Back analysis of dam foundation elastic constant of hydropower station
强夯压密法在西霞院坝基处理中的应用
Dynamic Compaction in the Ground Stabilization of Xixiayuan Dam
陆浑水库坝基断层破碎带渗透稳定性评价
A SYSTEMIC EVALUATION OF SEEPAGE STABILITY FOR FRACTURE ZONE IN LUHUN DAM FOUNDATION
探地雷达在水库坝基古河槽勘察中的应用
The Use of Radar for Ground Exploring in Investigation of Ancient Stream Channel for Dam Foundation of Reservoi
新疆下坂地水利枢纽坝基防渗墙试验工程施工
Construction of Diaphragm Wall in Dam Foundation at Xiabandi Water Conservancy Project in Xinjiang
裂隙面发育与坝基开挖面近于平行,形成兜底缝。
the surface of the unloading fissures is almost parallel to the surface of excavation base.
石门拱坝坝踵裂缝及其对坝基扬压水位影响
Dam heel crack of Shimen arch dam and its effect on dam foundation uplift
王家厂水库坝基砂卵石层高喷防渗技术研究
On seepage control technology by high pressure grouting for the sand and gravel foundation of Wangjiachang reservoir
增设水垫塘对坝基扬压力影响的数值分析
NUMERICAL COMPUTATION AND ANALYSIS OF INFLUENCE OF PLUNGE POOL CONSTRUCTION ON UPLIFT PRESSURE OF DAM FOUNDATION
问:坝基拼音怎么拼?坝基的读音是什么?坝基翻译成英文是什么?
答:坝基的读音是bàjī,坝基翻译成英文是 The base of a dam.
问:坝基截水墙槽拼音怎么拼?坝基截水墙槽的读音是什么?坝基截水墙槽翻译成英文是什么?
答:坝基截水墙槽的读音是bà jī jié shuǐ qiáng cáo,坝基截水墙槽翻译成英文是 key trench
问:坝基补缝填坑处理拼音怎么拼?坝基补缝填坑处理的读音是什么?坝基补缝填坑处理翻译成英文是什么?
答:坝基补缝填坑处理的读音是bà jī bǔ fèng tián kēng chǔ lǐ,坝基补缝填坑处理翻译成英文是 dental treatment